Black Mountain Minerals designs and builds mineral processing plants engineered for a specific orebody or waste stream. There is no standard model. Each plant begins with testwork on representative material, and the flowsheet, circuit configuration and throughput are derived from what that material is shown to require.
This matters because recovery is determined long before a plant is switched on. Two chrome deposits with the same head grade can demand entirely different circuits depending on particle size distribution, liberation and slimes content. A plant designed around the average case underperforms on both. BMM's approach is to establish the characteristics of the material first, then engineer to the point of highest recoverable value from that material.
Design, fabrication, construction and commissioning are delivered under one contract. Structural steelwork is fabricated, sandblasted and coated in-house at the Brits facility in North West Province, and the company operates its own crane and transport fleet for delivery and erection. Where a client prefers it, BMM will also operate the completed plant.
| Stage | What It Delivers |
|---|---|
| 01 Characterisation | Representative sampling and testwork to establish head grade, mineralogy, particle size distribution and liberation characteristics. |
| 02 Flowsheet Design | A process route selected against the testwork results and the client's target product specification. |
| 03 Engineering | Detailed design, equipment selection and structural engineering, sized to the agreed throughput and site conditions. |
| 04 Fabrication | Structural steelwork fabricated, sandblasted and coated in-house at the Brits facility. |
| 05 Construction | Delivery, civil works, electrical installation and erection on site, using BMM's own crane and transport fleet. |
| 06 Commissioning | Circuit commissioning to design specification, with operator handover or continued operation by BMM. |
Not every mining project demands a new build. Black Mountain Minerals provides a complete turnkey refurbishment and relocation service for existing chrome washplants — recovering significant value from idle or underperforming plant at a fraction of the cost of new equipment.
Our process begins with a site assessment and mechanical condition audit, followed by planned de-establishment using our own crane and heavy haulage fleet. Once at our Brits facility, plant components undergo mechanical refurbishment, spiral replacement or reconfiguration, structural repairs, and full sandblasting and recoating before re-erection at the new site.
We have delivered this service on live operational sites with active mining activities — maintaining zero lost-time incidents (LTI) throughout. Our project at Mooinooi, North West Province, demonstrates this capability: a full de-establishment, upgrade to tailings-optimised spiral modules, and re-erection using a 50-tonne mobile crane on a live chrome tailings site.
Industrial surface preparation and protective coating is a core competency within Black Mountain Minerals — developed through the founding director's background in the SADC coatings industry via Epoxy Emporium. Every plant we manufacture is sandblasted and coated in-house at our Brits facility before delivery, ensuring full corrosion protection and coating integrity from day one.
This service is also offered as a standalone contract to mining and industrial clients requiring surface preparation, primer application, and multi-coat protective finishing to industrial specification. We work across carbon steel, mild steel, and structural sections commonly found in mining and processing environments.
Black Mountain Minerals holds active export credentials and trades across five mineral commodity classes: chrome, coal, copper, antimony and tin. Our trading activity includes both raw ore and beneficiated products — chrome concentrate, RB2 coal and RB3 coal — allowing us to participate across the value chain depending on buyer specification.
Our export number (CU25174750) is active and structured for cross-border commodity trade. All trading activity operates under full VAT and tax registration and through our FNB business banking account, supporting transparent and compliant commercial transactions with domestic and international counterparties.
Black Mountain Minerals holds a substantial Zimbabwe mining portfolio centred on the Epoch Mine — a 1,000-hectare gold property comprising historically productive gold formations currently undergoing active prospecting and development.
The Epoch Mine property is valued at USD 35M+ and represents the Zimbabwe leg of the group's long-term growth strategy. The company is pursuing systematic claim pegging, geological prospecting, and in-country partnership development to advance the property toward production-scale extraction.